← Back to search
PARADIGM CCW JV LLC
PHOENIX, AZ, 85018
UnclaimedClaim this profile (free)
Prime contracting experience
14 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Defense Department of the Air Force | THIS PROJECT RENOVATES BUILDING 96 TO MEET PHYSICAL SECURITY REQUIREMENTS TO SUPPORT 755 OSS AT DAVIS-MONTHAN AFB, AZ. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE SOW. | FA487724D0015USAspending | $356,008 | Jul 1, 2026 | Sep 4, 2025 – Oct 30, 2026 |
| Prime | Department of Defense Department of the Air Force | PROJECT FBNV250045 INCLUDES ALL WORK NECESSARY TO PERFORM DESIGN AND CONSTRUCTION SERVICES FOR THE DEMOLITION/ REPAIR/ CONSTRUCTION IN BLDG. 4836 79TH RQS FOR REPLACING FLOORING AND LIGHT FIXTURES IN STRICT ACCORDANCE WITH THE STATEMENT OF WORK (SOW) | FA487724D0015USAspending | $571,121 | Jun 16, 2026 | Sep 2, 2025 – Jul 31, 2026 |
| Prime | Department of Defense Department of the Air Force | REPAIR/UPGRADE ELECTRICAL SERVICES AT BUILDING 7222 - FBNV 260032 | FA487724D0015USAspending | $865,213 | Jun 12, 2026 | Jun 10, 2026 – Jun 4, 2027 |
| Prime | Department of Defense Department of the Air Force | THIS IS A DESIGN-BUILD PROJECT THAT ENTAILS THE DESIGN AND CONSTRUCTION OF TWO 40 X 40 FOOT OPEN-WALLED UV STORAGE FACILITY FOR THE DEPARTMENT OF THE AIR FORCE RESCUE. | FA487724D0015USAspending | $832,879 | May 29, 2026 | Jun 1, 2026 – Nov 28, 2026 |
| Prime | Department of Defense Department of the Air Force | PROJECT FBNV260039 INCLUDES ALL WORK NECESSARY TO DESIGN AND BUILD AN RQG HUMAN PERFORMANCE TRAINING CENTER (HPTC) | FA487724D0015USAspending | $3,461,915 | May 26, 2026 | May 21, 2026 – Mar 27, 2027 |
| Prime | Department of Defense Department of the Air Force | A. THE MULTIPLE AWARD CONSTRUCTION CONTRACT IS DESIGNED TO PROVIDE A FLEXIBLE, COMPETITIVE, AND RESPONSIVE CONTRACTUAL CAPABILITY TO PERFORM DESIGN-BUILD AND BID-BUILD CONSTRUCTION WORK AT DAVIS-MONTHAN AFB, AZ AND LUKE AFB, AZ | FA487724D0015USAspending | $6,646,544 | May 11, 2026 | Oct 10, 2025 – Aug 20, 2026 |
| Prime | Department of Defense Department of the Air Force | THIS IS A DESIGN BUILD PROJECT, AND THE PREPARATION OF THE TEMPORARY FACILITY FOR AMU RELOCATABLE FACILITIES (RLF). | FA487724D0015USAspending | $1,487,483 | May 11, 2026 | May 11, 2026 – Jan 6, 2027 |
| Prime | Department of Defense Department of the Air Force | DESIGN AND CONSTRUCTION SERVICES FOR A 6,400 SQUARE-FOOT (80-FEET X 80-FEET) METAL BUILDING TO SERVE AS A CLIMATE-CONTROLLED STORAGE AND VEHICLE MAINTENANCE FACILITY FOR 88 TES. | FA487724D0015USAspending | $3,316,568 | Apr 17, 2026 | Apr 15, 2026 – Apr 17, 2026 |
| Prime | Department of Defense Department of the Air Force | THE CONTRACTOR SHALL PROVIDE REPAIR, REPLACEMENT, AND UPGRADE OF THE EXISTING BREATHING AIR SUPPLY SYSTEM AND FUEL TANK VENTILATION SYSTEM AT BUILDING 4891 ON DAVIS MONTHAN AIR FORCE BASE (DMAFB) IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). | FA487724D0015USAspending | $347,623 | Mar 16, 2026 | Aug 27, 2025 – Jul 15, 2026 |
| Prime | Department of Defense Department of the Navy | B508, B517 AND B523 ROOF REPAIR | N6426724D0004USAspending | $1,389,942 | Jan 16, 2026 | May 21, 2025 – Jan 26, 2026 |
| Prime | Department of Defense Department of the Air Force | THE CONTRACTOR SHALL PROVIDE REMOVAL AND REPLACEMENT OF AIR HANDLING SYSTEMS, EVAPORATIVE COOLERS, AND CHILLERS IN BUILDINGS 7440, 7401 AND 7506 AT DAVIS MONTHAN AIR FORCE BASE (DMAFB) IAW THE STATEMENT OF WORK (SOW) (ATTACHMENT 1). | FA487724D0015USAspending | $2,129,073 | Sep 12, 2025 | Sep 30, 2025 – May 27, 2026 |
| Prime | Department of Defense Department of the Air Force | A. THE MULTIPLE AWARD CONSTRUCTION CONTRACT IS DESIGNED TO PROVIDE A FLEXIBLE, COMPETITIVE, AND RESPONSIVE CONTRACTUAL CAPABILITY TO PERFORM DESIGN-BUILD AND BID-BUILD CONSTRUCTION WORK AT DAVIS-MONTHAN AFB, AZ AND LUKE AFB, AZ | FA487724D0015USAspending | $899,983 | Aug 15, 2025 | Dec 30, 2024 – Oct 16, 2025 |
| Prime | Department of Defense Department of the Air Force | THIS PROJECT CALLS FOR THE DESIGN, PLANS, SPECIFICATIONS, AND REPAIR OF BUILDING 4800 AT DMAFB FOR THE INCOMING MC-130J SQUAD OPS. | FA487724D0015USAspending | $6,679,444 | Jun 25, 2025 | Jun 24, 2025 – Sep 17, 2026 |
| Prime | Department of Defense Department of the Navy | B544 AND B547 AV WALL UPGRADE | N6426724D0004USAspending | $265,367 | Jun 11, 2025 | Jun 11, 2025 – Sep 30, 2025 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of DefenseGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.