Trenching, Conduit and Ground-well Installation
Department of State · U.S. EMBASSY KINGSTON
Respond by: Nov 25, 2026, 2:00 PM UTC−526 days left
From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC
Notice facts
Source: SAM.gov Contract Opportunities public data file
- Solicitation number
- 19JM3727Q0002
- Notice type
- Solicitation
- Posted
- Oct 28, 2026
- Response date
- Respond by Nov 25, 2026, 2:00 PM UTC−5
- Set-aside
- No Set aside used
- NAICS code
- 238910 Site Preparation Contractors
- Product or service code
- N038
- Place of performance
- Kingston, JAM
- Contracting office
- U.S. EMBASSY KINGSTON (19JM37)WASHINGTON, DC 20520
- Agency
- Department of State · Department of State
Past prime awardees
Source: Award history, not a list of bidders on this notice
Past prime awardees · award history, not a list of bidders on this notice
3 companies held prime contracts from this sub-agency under NAICS 238910 (none from this office in FedSub's data).
- DELMA CONSTRUCTION COMPANY · No first-tier subawards reported in FedSub's data
2 more past prime awardees on Professional
Description
Source: SAM.gov Contract Opportunities public data file
Description The United Stated Embassy in Kingston is requesting proposals for Trenching, Conduit And Ground-Well Installation in various locations on the Embassy compound. The contractor will provide all labor, equipment, supervision, material specific to the back filling and compaction and management needed to complete the job Infrastructure Support System - Handhole / Underground Conduit System Trenching Nine locations have been identified requiring trench work. Thirteen locations have been identified requiring trench work. Before excavation, the Contractor shall locate and verify all existing utilities in the proposed trench alignment. If excavation interferes with existing drains, piping, or structures, the Contractor shall immediately notify, in writing, the COR and provide temporary protection for these systems before proceeding. Trenching from Handholes The Contractor shall make wall penetrations into existing manholes/handholes as required for the number and size of conduits entering and exiting each structure, in accordance with the drawings. Conduit Existing conduit shall remain in place unless the drawings specifically direct removal or modification. Under grass, soil, the Contractor shall install Schedule 80 PVC conduit with a minimum cover of 24 inches (610 mm) from finished grade to top of conduit, or as indicated on the drawings, whichever is greater. All underground 90 degree bends with a 12inch (305 mm) radius shall use prefabricated sweeping bends. Above grade, all underground PVC conduit shall transition to rigid galvanized steel (RGS) using PVC to RGS couplers. The Contractor shall install pull lines in all new conduit runs. Soil and Backfill Materials Soil Materials The Contractor shall provide all labor and materials for soil and backfill, where required. Select Backfill: ASTM D 2487 soil classification groups SW, SP, and SM, or combinations thereof; free of rock or gravel larger than 3 inches (75 mm), debris, waste, frozen materials,…
Versions on SAM.gov
Source: SAM.gov Contract Opportunities public data file
Posted Oct 28, 2026SolicitationCurrent version
Respond by Nov 25, 2026, 2:00 PM UTC−5