Create a free account to keep browsing
It takes 30 seconds. You can open three notice pages a day without an account; a free account opens every notice, and lists the ones in your NAICS codes.
Design-Build Services – STM Security Fencing - North Boundary
Department of Energy · ALLIANCE FOR ENERGY INNOVATION, LLC - DOE CONTRACTOR
Respond by: Nov 11, 2026, 5:00 PM UTC−713 days left
From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC
Notice facts
Source: SAM.gov Contract Opportunities public data file
- Solicitation number
- RFP-2027-27107
- Notice type
- Solicitation
- Posted
- Oct 7, 2026 · Amended Oct 22, 2026
- Response date
- Respond by Nov 11, 2026, 5:00 PM UTC−7
- Set-aside
- Small Business Set Aside - Total
- NAICS code
- 238990 All Other Specialty Trade Contractors
- Product or service code
- 5660
- Place of performance
- Golden, CO 80401
- Contracting office
- ALLIANCE FOR ENERGY INNOVATION, LLC - DOE CONTRACTOR (899060)Golden, CO 80402
- Agency
- Department of Energy · Department of Energy
Past prime awardees
Source: Award history, not a list of bidders on this notice
Past prime awardees · award history, not a list of bidders on this notice
2 companies held prime contracts from this sub-agency under NAICS 238990 (none from this office in FedSub's data).
- COMPLETE CONCRETE, INC. · No first-tier subawards reported in FedSub's data
1 more past prime awardee on Professional
Description
Source: SAM.gov Contract Opportunities public data file
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design?build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain?link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design?Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued?for?Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design?to?cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and…
Versions on SAM.gov
Source: SAM.gov Contract Opportunities public data file
Posted Oct 22, 2026SolicitationCurrent version
Respond by Nov 11, 2026, 5:00 PM UTC−7
This version on SAM.gov (opens SAM.gov in a new tab)Posted Oct 8, 2026Solicitation
Respond by Nov 11, 2026, 5:00 PM UTC−7
This version on SAM.gov (opens SAM.gov in a new tab)Posted Oct 7, 2026Solicitation
Respond by Nov 11, 2026, 5:00 PM UTC−7
This version on SAM.gov (opens SAM.gov in a new tab)