Opportunities
Sources soughtAmended Oct 28, 2026Accepting responses

Electric Modernization Upgrade

Department of the Navy · NAVAL AIR WARFARE CENTER

Respond by: Dec 1, 2026, 4:00 PM UTC−833 days left

From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC

Notice facts

Source: SAM.gov Contract Opportunities public data file

Solicitation number
BAA-N6893625S0001-0001
Notice type
Sources sought
Posted
Oct 28, 2026 · Amended Oct 28, 2026
Response date
Respond by Dec 1, 2026, 4:00 PM UTC−8
Set-aside
None stated
NAICS code
541715 Research and Development in the Physical, Engineering, and Life Sciences
Product or service code
AC13
Place of performance
Not stated
Contracting office
NAVAL AIR WARFARE CENTER (N68936)CHINA LAKE, CA 93555
Agency
Department of Defense · Department of the Navy

Past prime awardees

Source: Award history, not a list of bidders on this notice

Past prime awardees · award history, not a list of bidders on this notice

101 companies held prime contracts from this office under NAICS 541715; 26 of them reported first-tier subawards to companies with NAICS 541715 in FedSub's records.

  • KBR WYLE SERVICES, LLC · Reported first-tier subawards to 129 companies with NAICS 541715 in FedSub's records (latest May 2026).

24 more past prime awardees on Professional

Description

Source: SAM.gov Contract Opportunities public data file

The Naval Air Warfare Center Weapons Division (NAWCWD) has developed and intends to field a modular, organic capability consisting of commercial-off-the-shelf (COTS) components integrated into custom hardware for the MH-60R Seahawk helicopter. The Government has established a viable system baseline, however, a standardized, repeatable, and supportable production, deployment, and sustainment process is not yet developed. With an initial operational capability target of Q1 FY2028, the program's small scope makes traditional, large-scale support and depot-level sustainment models highly cost-prohibitive. The current ad-hoc model lacks a process with defined material flow, supply-chain management, quality control, and software deployment process. Consequently, ongoing assembly and support practices require excessive time and specialized personnel that a small team cannot realistically maintain. Furthermore, the existing packaging is not optimized for rapid global air transport, and the chassis design needs human factors optimization for installation and removal in shipboard and austere environments. As a result, these cumulative limitations reduce overall operational availability, increase the burden on forward-deployed personnel, and raise long-term lifecycle costs. This delays the Navy's critical ability to rapidly produce, transport, install, and sustain this capability worldwide. Desired Outcomes & Constraints (Submissions may be for one or all requirements) 1. ?Process Design: Production Process: An operational, production-representative process capable of producing a defined pilot lot using controlled material, assembly, programming, inspection, test, configuration-management, packaging, and acceptance processes that is executable by a small team. Deployment Process: A lightweight, practical support process that enables a small team to provision and deploy the capability with minimal specialized infrastructure. Sustainment Process: A lightweight, practical…

SAM.gov's data file removes line breaks; read the formatted notice and attachments on SAM.gov.

Versions on SAM.gov

Source: SAM.gov Contract Opportunities public data file

  1. Posted Oct 28, 2026Sources soughtCurrent version

    Respond by Dec 1, 2026, 4:00 PM UTC−8

    Changed from the version before: Description

    This version on SAM.gov (opens SAM.gov in a new tab)
  2. Posted Oct 28, 2026Sources sought

    Respond by Dec 1, 2026, 4:00 PM UTC−8

    This version on SAM.gov (opens SAM.gov in a new tab)

Sources

  • SAM.gov Contract Opportunities public data file: file generated Oct 29, 2026, 3:30 AM UTC
  • USAspending.gov prime contract awards, as loaded into FedSub: actions through Oct 25, 2026
  • USAspending.gov first-tier subaward reports (FFATA): reports through Sep 30, 2026
  • Your partner preferences and your company's records on FedSub

Notices posted or changed after SAM.gov generated its file appear in FedSub after the next load. Check SAM.gov for the current version before you respond.

Source: SAM.gov Contract Opportunities public data file. FedSub is not affiliated with SAM.gov or GSA.

Electric Modernization Upgrade — Department of the Navy | FedSub