Create a free account to keep browsing
It takes 30 seconds. You can open three notice pages a day without an account; a free account opens every notice, and lists the ones in your NAICS codes.
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Department of the Army · W2SN ENDIST JAPAN
Respond by: Jan 25, 2027, 2:00 PM UTC+987 days left
From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC
Notice facts
Source: SAM.gov Contract Opportunities public data file
- Solicitation number
- W912HV26RA009
- Notice type
- Solicitation
- Posted
- Jul 14, 2026 · Amended Oct 19, 2026
- Response date
- Respond by Jan 25, 2027, 2:00 PM UTC+9
- Set-aside
- None stated
- NAICS code
- 237120 Oil and Gas Pipeline and Related Structures Construction
- Product or service code
- Y1NA
- Place of performance
- Not stated
- Contracting office
- W2SN ENDIST JAPAN (W912HV)APO, 96338
- Agency
- Department of Defense · Department of the Army
Past prime awardees
Source: Award history, not a list of bidders on this notice
Past prime awardees · award history, not a list of bidders on this notice
7 companies held prime contracts from this office under NAICS 237120.
- TOA CORPORATION · No first-tier subawards reported in FedSub's data
6 more past prime awardees on Professional
Description
Source: SAM.gov Contract Opportunities public data file
Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.
Versions on SAM.gov
Source: SAM.gov Contract Opportunities public data file
Posted Oct 19, 2026SolicitationCurrent version
Respond by Jan 25, 2027, 2:00 PM UTC+9
Changed from the version before: Description
This version on SAM.gov (opens SAM.gov in a new tab)Posted Sep 25, 2026Solicitation
Respond by Jan 25, 2027, 2:00 PM UTC+9
Changed from the version before: Description
This version on SAM.gov (opens SAM.gov in a new tab)Posted Sep 13, 2026Solicitation
Respond by Jan 25, 2027, 2:00 PM UTC+9
Changed from the version before: Description
This version on SAM.gov (opens SAM.gov in a new tab)Posted Sep 9, 2026Solicitation
Respond by Jan 25, 2027, 2:00 PM UTC+9
Changed from the version before: Description
This version on SAM.gov (opens SAM.gov in a new tab)Posted Aug 12, 2026Solicitation
Respond by Jan 25, 2027, 2:00 PM UTC+9
This version on SAM.gov (opens SAM.gov in a new tab)