Opportunities
Sources soughtAmended Oct 21, 2026Accepting responses

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Department of the Army · W2SD ENDIST NEW ENGLAND

Respond by: Nov 23, 2026, 1:00 PM UTC−524 days left

From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC

Notice facts

Source: SAM.gov Contract Opportunities public data file

Solicitation number
W912WJ27X1CTD
Notice type
Sources sought
Posted
Oct 21, 2026 · Amended Oct 21, 2026
Response date
Respond by Nov 23, 2026, 1:00 PM UTC−5
Set-aside
None stated
NAICS code
237990 Other Heavy and Civil Engineering Construction
Place of performance
Surry, NH
Contracting office
W2SD ENDIST NEW ENGLAND (W912WJ)CONCORD, MA 01742
Agency
Department of Defense · Department of the Army

Past prime awardees

Source: Award history, not a list of bidders on this notice

Past prime awardees · award history, not a list of bidders on this notice

25 companies held prime contracts from this office under NAICS 237990; 4 of them reported first-tier subawards to companies with NAICS 237990 in FedSub's records.

  • WEEKS MARINE, INC. · Reported first-tier subawards to 18 companies with NAICS 237990 in FedSub's records (latest Apr 2025).

24 more past prime awardees on Professional

Description

Source: SAM.gov Contract Opportunities public data file

The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Announcement for Construction Services for the for the repairing of the inlet pipe to the float well and replace weathered/damaged staff gauges at the Surry Moutain Lake Dam in Surry NH. This announcement is to determine interest, availability and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned and Small Business concerns for this project. The NAICS code for this procurement is 237990 with a size standard of $45M. The project is planned to be solicited in the Winter of 2026 with construction to begin place in the Summer of 2027. The estimated construction cost is between $350,000 - $500,000. The project site is the inlet culvert on the lake side of the Surry Mountain Dam in Surry, NH. Work for this project will likely include, but not be limited to, the following: Coffer dam at inlet pipe location. Float well pipe (3-inch cast iron) cleaning. Installation of internal liner for float well pipe. Pre and Post liner installation CCTV inspections. Repairs to the slash-zone pipe segment Protection and concrete encasement of the external float well pipe Staff Gauges: Pressure treated posts with attached enamel coated metal measuring strip. Scheduled work will be affected by depth of pool. Assumed low pool depths are July and August (when work can be conducted safely), but adverse weather conditions (rain events) could delay or postpone work schedules. Surry Mountain staff will keep COR informed of pool levels to anticipate when work can commence if outside assumed low pool depths. Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, small business, etc.), as well as qualifications and experience in performing the work components stated above. Please include at least two specific examples of the firm’s experience performing the work requirements stated above. The projects must have been performed…

SAM.gov's data file removes line breaks; read the formatted notice and attachments on SAM.gov.

Versions on SAM.gov

Source: SAM.gov Contract Opportunities public data file

  1. Posted Oct 21, 2026Sources soughtCurrent version

    Respond by Nov 23, 2026, 1:00 PM UTC−5

    Changed from the version before: Description

    This version on SAM.gov (opens SAM.gov in a new tab)
  2. Posted Oct 21, 2026Sources sought

    Respond by Nov 23, 2026, 1:00 PM UTC−5

    This version on SAM.gov (opens SAM.gov in a new tab)

Sources

  • SAM.gov Contract Opportunities public data file: file generated Oct 29, 2026, 3:30 AM UTC
  • USAspending.gov prime contract awards, as loaded into FedSub: actions through Oct 25, 2026
  • USAspending.gov first-tier subaward reports (FFATA): reports through Sep 30, 2026
  • Your partner preferences and your company's records on FedSub

Notices posted or changed after SAM.gov generated its file appear in FedSub after the next load. Check SAM.gov for the current version before you respond.

Source: SAM.gov Contract Opportunities public data file. FedSub is not affiliated with SAM.gov or GSA.

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH — Department… | FedSub