Opportunities
SolicitationAmended Oct 20, 2026Accepting responses

Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine

Department of the Army · W2SD ENDIST NEW ENGLAND

Respond by: Nov 10, 2026, 1:00 PM UTC−511 days left

From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC

Notice facts

Source: SAM.gov Contract Opportunities public data file

Solicitation number
W912WJ27BA003
Notice type
Solicitation
Posted
Oct 5, 2026 · Amended Oct 20, 2026
Response date
Respond by Nov 10, 2026, 1:00 PM UTC−5
Set-aside
Small Business Set Aside - Total
NAICS code
237990 Other Heavy and Civil Engineering Construction
Product or service code
Y1QA
Place of performance
Not stated
Contracting office
W2SD ENDIST NEW ENGLAND (W912WJ)CONCORD, MA 01742
Agency
Department of Defense · Department of the Army

Past prime awardees

Source: Award history, not a list of bidders on this notice

Past prime awardees · award history, not a list of bidders on this notice

25 companies held prime contracts from this office under NAICS 237990; 4 of them reported first-tier subawards to companies with NAICS 237990 in FedSub's records.

  • WEEKS MARINE, INC. · Reported first-tier subawards to 18 companies with NAICS 237990 in FedSub's records (latest Apr 2025).

24 more past prime awardees on Professional

Description

Source: SAM.gov Contract Opportunities public data file

The Isle au Haut Thoroughfare Federal Navigation Project, located between Isle au Haut, Maine and Kimball Island, Maine on the outskirts of Penobscot Bay, about six miles southeast of Stonington and 25 miles east of Rockland. The Federal Navigation Project consists of a -6-foot Mean Lower Low Water (MLLW) deep by 75-foot wide extending 1,200-foot in length through the shoal in the thoroughfare.The proposed work consists of mechanically dredging approximately 3,355 cubic yards (cy) (1,183 cy required, plus 2,172 cy overdepth) of shoaled material consisting of highly compacted coarse sand and gravel, with areas of cobbles and isolated small boulders from the channel. Due to the material type, a mechanical dredge with the ability to dig highly compacted coarse sand and gravel will be required. The proposed action is to dredge to the authorized depth of -6-foot MLLW plus an additional 1-foot of required advance maintenance with an additional allowable 1-foot of overdepth (e.g. -7-foot MLLW required + 1-foot allowable OD). One-time, advanced maintenance is approved for the entirety of the 1200-foot long authorized channel. The dredged material will be placed at the Flake Island Disposal Site (FIDS) which is approximately 1 nautical mile northwest of the FNP. Placement of the dredged material (sand, gravel and cobble) at Flake Island Disposal Site will benefit both juvenile lobster habitat and juvenile cod by increasing the areas habitat complexity.The anticipated allowable dredging window is between September 15 and April 1 to avoid impacts to spawning shellfish, benthic resources, Essential Fish Habitat (EFH) of federally managed species, threatened and endangered species and interactions with mobile fishing gear.

SAM.gov's data file removes line breaks; read the formatted notice and attachments on SAM.gov.

Versions on SAM.gov

Source: SAM.gov Contract Opportunities public data file

  1. Posted Oct 20, 2026SolicitationCurrent version

    Respond by Nov 10, 2026, 1:00 PM UTC−5

    This version on SAM.gov (opens SAM.gov in a new tab)
  2. Posted Oct 20, 2026Solicitation

    Respond by Nov 10, 2026, 1:00 PM UTC−5

    This version on SAM.gov (opens SAM.gov in a new tab)
  3. Posted Oct 19, 2026Solicitation

    Respond by Nov 10, 2026, 1:00 PM UTC−5

    Changed from the version before: Response date

    This version on SAM.gov (opens SAM.gov in a new tab)
  4. Posted Oct 6, 2026Solicitation

    Respond by Nov 5, 2026, 1:00 PM UTC−5

    This version on SAM.gov (opens SAM.gov in a new tab)
  5. Posted Oct 6, 2026Solicitation

    Respond by Nov 5, 2026, 1:00 PM UTC−5

    Changed from the version before: Response date

    This version on SAM.gov (opens SAM.gov in a new tab)

Sources

  • SAM.gov Contract Opportunities public data file: file generated Oct 29, 2026, 3:30 AM UTC
  • USAspending.gov prime contract awards, as loaded into FedSub: actions through Oct 25, 2026
  • USAspending.gov first-tier subaward reports (FFATA): reports through Sep 30, 2026
  • Your partner preferences and your company's records on FedSub

Notices posted or changed after SAM.gov generated its file appear in FedSub after the next load. Check SAM.gov for the current version before you respond.

Source: SAM.gov Contract Opportunities public data file. FedSub is not affiliated with SAM.gov or GSA.

Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au… | FedSub