Opportunities
SolicitationAmended Oct 5, 2026Accepting responses

PIGA Float Assembly Repair Program

Department of the Air Force · FA8214 AFNWC PZBB

Respond by: Dec 3, 2026, 12:00 PM UTC−734 days left

From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC

Notice facts

Source: SAM.gov Contract Opportunities public data file

Solicitation number
FA821426RB002
Notice type
Solicitation
Posted
Aug 10, 2026 · Amended Oct 5, 2026
Response date
Respond by Dec 3, 2026, 12:00 PM UTC−7
Set-aside
None stated
NAICS code
334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
Product or service code
J014
Place of performance
Hill AFB, UT
Contracting office
FA8214 AFNWC PZBBHILL AFB, UT 84056
Agency
Department of Defense · Department of the Air Force

Past prime awardees

Source: Award history, not a list of bidders on this notice

Past prime awardees · award history, not a list of bidders on this notice

1 company held prime contracts from this office under NAICS 334511; 1 of them reported first-tier subawards to companies with NAICS 334511 in FedSub's records.

  • THE BOEING COMPANY · Reported first-tier subawards to 9 companies with NAICS 334511 in FedSub's records (latest Sep 2026).

Description

Source: SAM.gov Contract Opportunities public data file

Login at https://piee.eb.mil and search for 'FA821426RB002' to obtain more details.* Documents related to this procurment are only available through PIEE. 1. Executive Summary: Background & Objective The U.S. Air Force has a critical requirement to support the Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) by maintaining the operational readiness of the Missile Guidance Set (MGS) to meet warfighter requirements. Specifically, this effort supports the repair line for the Pendulous Integrated Gyroscopic Accelerometer (PIGA) Float Assembly. The PIGA Float is a critical and precise sub-assembly that serves as the heart of the PIGA instrument, enabling it to measure missile acceleration. Each MGS contains three separate PIGA instruments (each housing a PIGA Float). Without this critical component, the ICBM would cease to function properly. The PIGA Float repair effort is a continuous operation necessary to avoid mission degradation. Quality control and precision engineering are paramount due to the strategic importance of the MMIII weapon system. The contractor must maintain stringent quality assurance protocols to guarantee that each repaired PIGA Float meets the rigorous military specifications. 2. Scope of Work The contractor shall provide the necessary personnel, facilities, and expertise to support the PIGA Float Assembly repair line. The primary scope includes: Repair Operations - The re-manufacture, rebuild, and repair of PIGA Float Assemblies. Volume / Throughput - The repair of 96 PIGA Floats per year. Government Furnished Equipment (GFE) - The repair and/or replacement of GFE as required to support continuous operation of the PIGA Float repair line 3. Contract Structure & Period of Performance The Government anticipates awarding an Indefinite Delivery/Indefinite Quantity (IDIQ) contract utilizing a mix of Cost-Plus-Fixed-Fee (CPFF) and Firm-Fixed-Price (FFP) pricing arrangements. Contract Duration - 5-Year IDIQ Anticipated Ordering Period - 1…

SAM.gov's data file removes line breaks; read the formatted notice and attachments on SAM.gov.

Versions on SAM.gov

Source: SAM.gov Contract Opportunities public data file

  1. Posted Oct 5, 2026SolicitationCurrent version

    Respond by Dec 3, 2026, 12:00 PM UTC−7

    Changed from the version before: Response date, Place of performance

    This version on SAM.gov (opens SAM.gov in a new tab)
  2. Posted Aug 11, 2026Solicitation

    Respond by Oct 5, 2026, 12:00 PM UTC−6

    Changed from the version before: Description

    This version on SAM.gov (opens SAM.gov in a new tab)
  3. Posted Aug 10, 2026Solicitation

    Respond by Oct 5, 2026, 12:00 PM UTC−6

    This version on SAM.gov (opens SAM.gov in a new tab)

Sources

  • SAM.gov Contract Opportunities public data file: file generated Oct 29, 2026, 3:30 AM UTC
  • USAspending.gov prime contract awards, as loaded into FedSub: actions through Oct 25, 2026
  • USAspending.gov first-tier subaward reports (FFATA): reports through Sep 30, 2026
  • Your partner preferences and your company's records on FedSub

Notices posted or changed after SAM.gov generated its file appear in FedSub after the next load. Check SAM.gov for the current version before you respond.

Source: SAM.gov Contract Opportunities public data file. FedSub is not affiliated with SAM.gov or GSA.

PIGA Float Assembly Repair Program — Department of the Air Force | FedSub