Opportunities
SolicitationAmended Oct 26, 2026Accepting responses

ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE

Department of the Army · 0906 AQ CO CONTRACTING BAT

Respond by: Nov 4, 2026, 1:00 PM UTC+95 days left

From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC

Notice facts

Source: SAM.gov Contract Opportunities public data file

Solicitation number
W90VN626QA017
Notice type
Solicitation
Posted
Aug 20, 2026 · Amended Oct 26, 2026
Response date
Respond by Nov 4, 2026, 1:00 PM UTC+9
Set-aside
None stated
NAICS code
332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Product or service code
2510
Place of performance
96278
Contracting office
0906 AQ CO CONTRACTING BAT (W90VN6)APO, 96202
Agency
Department of Defense · Department of the Army

Past prime awardees

Source: Award history, not a list of bidders on this notice

Past prime awardees · award history, not a list of bidders on this notice

67 companies held prime contracts from this sub-agency under NAICS 332999 (none from this office in FedSub's data); 4 of them reported first-tier subawards to companies with NAICS 332999 in FedSub's records.

24 more past prime awardees on Professional

Description

Source: SAM.gov Contract Opportunities public data file

The amendment 0003 is issued to extend the closing date from 26 OCT 2026 to 4 NOV 2026, 1300 Hrs (KST).// The amendment 0002 is issued to extend the closing date from 15 OCT 2026 to 29 OCT 2026, 1300 Hrs (KST). //The amendment 0001 is issued to extend the closing date from 1 OCT 2026 to 15 OCT 2026, 1300 Hrs (KST). //This pre solicitation is conducted under the logistic cost sharing (LCS) program. The Government anticipates issuing a solicitation for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier (AVB) systems and associated Access Control Point (ACP) control systems at the Morin and Main Gates, Osan Air Base, Republic of Korea (ROK). Under this commercial acquisition, the Contractor shall be responsible for the demolition, removal, and disposal of existing AVBs; executing all necessary foundation, civil, and electrical site work; and performing the complete installation, point-to-point wiring, and power integration of the newly furnished equipment. Additionally, the Contractor must execute complex Programmable Logic Controller (PLC) reprogramming and system integration across multiple gatehouses, overwatch booths, vehicle inspection centers, traffic lights, and communication enclosures to achieve a fully synchronized, fail-safe ACP operation capable of maintaining full security functionality under both normal and power-loss conditions. The Performance Work Statement (PWS) containing all specific technical, execution, and commissioning requirements is attached for upcoming solicitation.

SAM.gov's data file removes line breaks; read the formatted notice and attachments on SAM.gov.

Versions on SAM.gov

Source: SAM.gov Contract Opportunities public data file

  1. Posted Oct 26, 2026SolicitationCurrent version

    Respond by Nov 4, 2026, 1:00 PM UTC+9

    Changed from the version before: Response date, Description

    This version on SAM.gov (opens SAM.gov in a new tab)
  2. Posted Oct 14, 2026Solicitation

    Respond by Oct 29, 2026, 1:00 PM UTC+9

    Changed from the version before: Response date, Description

    This version on SAM.gov (opens SAM.gov in a new tab)
  3. Posted Sep 30, 2026Solicitation

    Respond by Oct 15, 2026, 1:00 PM UTC+9

    Changed from the version before: Response date, Description

    This version on SAM.gov (opens SAM.gov in a new tab)
  4. Posted Aug 31, 2026Solicitation

    Respond by Oct 1, 2026, 1:00 PM UTC+9

    Changed from the version before: Notice type, Response date, Place of performance

    This version on SAM.gov (opens SAM.gov in a new tab)
  5. Posted Aug 20, 2026Presolicitation

    Respond by Aug 31, 2026, 9:00 AM UTC+9

    This version on SAM.gov (opens SAM.gov in a new tab)

Sources

  • SAM.gov Contract Opportunities public data file: file generated Oct 29, 2026, 3:30 AM UTC
  • USAspending.gov prime contract awards, as loaded into FedSub: actions through Oct 25, 2026
  • USAspending.gov first-tier subaward reports (FFATA): reports through Sep 30, 2026
  • Your partner preferences and your company's records on FedSub

Notices posted or changed after SAM.gov generated its file appear in FedSub after the next load. Check SAM.gov for the current version before you respond.

Source: SAM.gov Contract Opportunities public data file. FedSub is not affiliated with SAM.gov or GSA.

ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR… | FedSub