Opportunities
SolicitationAmended Oct 26, 2026Accepting responses

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Department of the Army · W071 ENDIST OMAHA

Respond by: Dec 3, 2026, 2:00 PM UTC−634 days left

From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC

Notice facts

Source: SAM.gov Contract Opportunities public data file

Solicitation number
W9128F27BA007
Notice type
Solicitation
Posted
Sep 22, 2026 · Amended Oct 26, 2026
Response date
Respond by Dec 3, 2026, 2:00 PM UTC−6
Set-aside
Small Business Set Aside - Total
NAICS code
237990 Other Heavy and Civil Engineering Construction
Product or service code
Y1PZ
Place of performance
57548
Contracting office
W071 ENDIST OMAHA (W9128F)OMAHA, NE 68102
Agency
Department of Defense · Department of the Army

Past prime awardees

Source: Award history, not a list of bidders on this notice

Past prime awardees · award history, not a list of bidders on this notice

43 companies held prime contracts from this office under NAICS 237990; 1 of them reported first-tier subawards to companies with NAICS 237990 in FedSub's records.

  • AMS INDUSTRIAL LLC · Reported first-tier subawards to 1 company with NAICS 237990 in FedSub's records (latest Oct 2021).

24 more past prime awardees on Professional

Description

Source: SAM.gov Contract Opportunities public data file

The project is located along the left descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water area between the island and the shoreline will develop into approximately 5.17 acres of emergent wetland, and this will also create approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.

SAM.gov's data file removes line breaks; read the formatted notice and attachments on SAM.gov.

Versions on SAM.gov

Source: SAM.gov Contract Opportunities public data file

  1. Posted Oct 26, 2026SolicitationCurrent version

    Respond by Dec 3, 2026, 2:00 PM UTC−6

    Changed from the version before: Notice type, Response date, Description

    This version on SAM.gov (opens SAM.gov in a new tab)
  2. Posted Oct 16, 2026Presolicitation

    No response date given

    Changed from the version before: Description

    This version on SAM.gov (opens SAM.gov in a new tab)
  3. Posted Sep 22, 2026Presolicitation

    No response date given

    This version on SAM.gov (opens SAM.gov in a new tab)

Sources

  • SAM.gov Contract Opportunities public data file: file generated Oct 29, 2026, 3:30 AM UTC
  • USAspending.gov prime contract awards, as loaded into FedSub: actions through Oct 25, 2026
  • USAspending.gov first-tier subaward reports (FFATA): reports through Sep 30, 2026
  • Your partner preferences and your company's records on FedSub

Notices posted or changed after SAM.gov generated its file appear in FedSub after the next load. Check SAM.gov for the current version before you respond.

Source: SAM.gov Contract Opportunities public data file. FedSub is not affiliated with SAM.gov or GSA.

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION,… | FedSub