Create a free account to keep browsing
It takes 30 seconds. You can open three notice pages a day without an account; a free account opens every notice, and lists the ones in your NAICS codes.
CO BR UCPO Blue Mesa Road(1) Blue Mesa Road
Federal Highway Administration · 6982AF CENTRAL FEDERAL LANDS DIVISI
Response date: No response date given
No response date given.
From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC
Notice facts
Source: SAM.gov Contract Opportunities public data file
- Solicitation number
- 6982AF27B000009
- Notice type
- Presolicitation
- Posted
- Oct 20, 2026 · Amended Oct 27, 2026
- Response date
- No response date givenNo response date given.
- Set-aside
- Small Business Set Aside - Total
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Product or service code
- Y1LB
- Place of performance
- Gunnison, CO 81231
- Contracting office
- 6982AF CENTRAL FEDERAL LANDS DIVISILAKEWOOD, CO 80228
- Agency
- Department of Transportation · Federal Highway Administration
Past prime awardees
Source: Award history, not a list of bidders on this notice
Past prime awardees · award history, not a list of bidders on this notice
121 companies held prime contracts from this office under NAICS 237310; 10 of them reported first-tier subawards to companies with NAICS 237310 in FedSub's records.
- CONWAY CONSTRUCTION CO · Reported first-tier subawards to 8 companies with NAICS 237310 in FedSub's records (latest Mar 2026).
24 more past prime awardees on Professional
Description
Source: SAM.gov Contract Opportunities public data file
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NAME: CO BR UCPO Blue Mesa Road(1) Blue Mesa Road Blue Mesa Road is a 1.44-mile corridor located in Gunnison County, CO and provides access to the Bureau of Reclamation (BOR) Power Plant and Pine Creek Trailhead recreational activities on the Curecanti National Recreational Area. SCOPE OF THE WORK Schedule A: Proposed rehabilitation of 0.86 miles to replace existing gravel roadway with asphalt concrete pavement. Reconstruction/Rehabilitation, as needed, for 0.24 miles of existing asphalt to incorporate raising roadway profile at US 50 intersection, drainage improvements including replacement and/or lining of damaged culverts, relocation of traffic counters, formalize parking area with ADA stalls, signing and striping, ditch reconditioning, rockfall mitigation. Option X: Proposed rehabilitation of 0.34 miles to replace existing gravel roadway with asphalt concrete pavement from BOR gate to Blue Mesa Power Plant, drainage improvements to include replacement of damaged culverts, signing and striping, ditch reconditioning, installation of 6” electrical conduit for purposes of future automatic gate installation. Option Y: Proposed 6-inch electric conduit installation and 2 ft x 2 ft max trenching for 2,215 LF miles from the electric security gate to The Blue Mesa Power Plant. Conduit will provide future access for BOR to provide electric connection to security gate. PRINCIPAL WORK ITEMS: Schedule A: 15225-0000 Slope, Reference, and Clearing and Grubbing Control: 1.051 MILE 20301-1900 Removal of Pipe Culvert: 5 EACH 20401-0000 Roadway Excavation: 1,500 CU YD 30201-2000 Roadway Aggregate, Method 2: 2,500 CU YD 30302-1000 Ditch Reconditioning: 3,280 LN FT 40301-0100 Asphalt Concrete Pavement, Type 1: 2,500 TON 60103-0140 Concrete, Headwall for 24-Inch Pipe Culvert (L-Shaped): 3 EACH 60103-0160 Concrete, Headwall for 30-Inch Pipe Culvert: 1 EACH 60103-0280 Concrete, Headwall for 66-Inch Pipe…
Versions on SAM.gov
Source: SAM.gov Contract Opportunities public data file
Posted Oct 27, 2026PresolicitationCurrent version
No response date given
This version on SAM.gov (opens SAM.gov in a new tab)Posted Oct 20, 2026Presolicitation
No response date given
This version on SAM.gov (opens SAM.gov in a new tab)