Create a free account to keep browsing
It takes 30 seconds. You can open three notice pages a day without an account; a free account opens every notice, and lists the ones in your NAICS codes.
Repair Punta Borinquen Lighthouse at USCG Base Borinquen, Aguadilla, Puerto Rico (PNUM 2993811)
U.S. Coast Guard · CEU MIAMI
Response date: No response date given
No response date given.
From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC
Notice facts
Source: SAM.gov Contract Opportunities public data file
- Solicitation number
- 2993811
- Notice type
- Presolicitation
- Posted
- Oct 26, 2026
- Response date
- No response date givenNo response date given.
- Set-aside
- Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Product or service code
- Z2PZ
- Place of performance
- Aguadilla, PR 00603
- Contracting office
- CEU MIAMI (70ZS04)Miami, FL 33177
- Agency
- Department of Homeland Security · U.S. Coast Guard
Past prime awardees
Source: Award history, not a list of bidders on this notice
Past prime awardees · award history, not a list of bidders on this notice
3 companies held prime contracts from this office under NAICS 236220.
- LEGO CONSTRUCTION CO · No first-tier subawards reported in FedSub's data
2 more past prime awardees on Professional
Description
Source: SAM.gov Contract Opportunities public data file
PRE-SOLICITATION NOTICE: THIS PROJECT IS BEING SET ASIDE FOR TOTAL HUBZONE BUSINESS CONCERNS. IT IS ANTICIPATED THAT THIS SET ASIDE WILL BE SOLICITED VIA INVITATION FOR BID (IFB). THE SOURCES SOUGHT THAT WAS POSTED FOR THIS PROJECT IS AS FOLLOWS: PN 2993811 – REPAIR PUNTA BORINQUEN LIGHTHOUSE AT UNITED STATES COAST GUARD BASE BORINQUEN, AGUADILLA, PUERTO RICO. This is not a pre-solicitation notice or solicitation for proposals/quotations. The base bid, on-site work consists of furnishing all labor, tools, equipment, materials, supervision, and transportation necessary for, and incidental to, Repair Punta Borinquen Lighthouse. The following is a general summary of the work: Develop and provide asbestos containing material (ACM) and lead based paint (LBP) investigation and analysis report. Prep surface with a combination of high-pressure water and spot washing with a stiff brush and cleaning solution on 3,200 square feet (SF) of exterior surface at the Punta Borinquen Lighthouse. Prep surface with a combination of high-pressure water and spot washing with a stiff brush and cleaning solution, as well as strip LBP within interior walls and metal stairway (2,560 SF). Repair spalling damage on the exterior wall and overhang on Punta Borinquen Lighthouse. Apply minor repairs to 160 square feet damaged areas, cracks, and unsound surface of exterior surface by dry cutting and patching. Repair rust damage on roof level and replace one two-square feet metal hatch access to roof, as we; as install 45 linear feet of metal guardrails along the roof edge. Replace a five feet 10 inches wide and nine feet six inches high entrance metal door to match existing on the Punta Borinquen Lighthouse. Replace a two feet six inches by three feet three inches metal louver window on first level to match existing on the Punta Borinquen Lighthouse. Base coat and paint with two coats of algae-resistant water-based elastomeric, high-build, acrylic coating (6,000 square feet) on concrete surfaces.…
Versions on SAM.gov
Source: SAM.gov Contract Opportunities public data file
Posted Oct 26, 2026PresolicitationCurrent version
No response date given
This version on SAM.gov (opens SAM.gov in a new tab)