Opportunities
PresolicitationAmended Oct 22, 2026Accepting responses

Tybee Island Shoreline Protection Project

Department of the Army · W074 ENDIST SAVANNAH

Respond by: Nov 6, 2026, 1:00 PM UTC−57 days left

From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC

Notice facts

Source: SAM.gov Contract Opportunities public data file

Solicitation number
W912HN27BA001
Notice type
Presolicitation
Posted
Oct 22, 2026 · Amended Oct 22, 2026
Response date
Respond by Nov 6, 2026, 1:00 PM UTC−5
Set-aside
None stated
NAICS code
237990 Other Heavy and Civil Engineering Construction
Product or service code
Z1KF
Place of performance
Tybee Island, GA 31328
Contracting office
W074 ENDIST SAVANNAH (W912HN)SAVANNAH, GA 31401
Agency
Department of Defense · Department of the Army

Past prime awardees

Source: Award history, not a list of bidders on this notice

Past prime awardees · award history, not a list of bidders on this notice

22 companies held prime contracts from this office under NAICS 237990; 3 of them reported first-tier subawards to companies with NAICS 237990 in FedSub's records.

  • MANSON CONSTRUCTION CO · Reported first-tier subawards to 26 companies with NAICS 237990 in FedSub's records (latest Jul 2026).

21 more past prime awardees on Professional

Description

Source: SAM.gov Contract Opportunities public data file

This presolicitation is for the Tybee Island Shoreline Protection Project. This acquisition is being offered as an unrestricted full and open competitive solicitation and will result in a single Firm Fixed- Price Contract Award. The construction magnitude for this project is between $10,000,000.00 and $25,000,000.00. Description of Work: The U.S. Army Corps of Engineers, Savannah District, intends to issue an Invitation for Bid (IFB) to award a single firm fixed-price contract. Project work consists of placing dredged material along the Front Beach at Tybee Island, Georgia. The Contract includes a Base Bid item and Optional Bid items. The Base Bid item consists of placing berm fill material along approximately 7,000 feet of the construction baseline. Optional Bid items include placing additional material along the Front Beach area. The berm width varies along the project length. The Base Bid quantity is approximately 820,000 cubic yards of material and the four Option Bid items consist of approximately 673,000 cubic yards of material to be dredged for this renourishment. The material for the project will be sourced from an approved offshore borrow area that is approximately 5,000 feet away from the south end of the project and 11,000 feet from the center of the project. Work also includes environmental restrictions and beach tilling. The total construction duration for this project is 90 days from Notice to Proceed (NTP). Evaluation Criteria: The contract will be solicited and procured using FAR Part 14 Sealed Bidding Procedures. Note: The Government anticipates issuing the invitation for bids on or after 06 November 2026. This date is estimated and subject to change. Actual dates and times will be identified in the solicitation. The solicitation will be issued in electronic format only and will be made available through the System for Award Management (SAM) website at https://sam.gov/. Interested parties are encouraged to register as an interested vendor on…

SAM.gov's data file removes line breaks; read the formatted notice and attachments on SAM.gov.

Versions on SAM.gov

Source: SAM.gov Contract Opportunities public data file

  1. Posted Oct 22, 2026PresolicitationCurrent version

    Respond by Nov 6, 2026, 1:00 PM UTC−5

    Changed from the version before: Place of performance, Description

    This version on SAM.gov (opens SAM.gov in a new tab)
  2. Posted Oct 22, 2026Presolicitation

    Respond by Nov 6, 2026, 1:00 PM UTC−5

    This version on SAM.gov (opens SAM.gov in a new tab)

Sources

  • SAM.gov Contract Opportunities public data file: file generated Oct 29, 2026, 3:30 AM UTC
  • USAspending.gov prime contract awards, as loaded into FedSub: actions through Oct 25, 2026
  • USAspending.gov first-tier subaward reports (FFATA): reports through Sep 30, 2026
  • Your partner preferences and your company's records on FedSub

Notices posted or changed after SAM.gov generated its file appear in FedSub after the next load. Check SAM.gov for the current version before you respond.

Source: SAM.gov Contract Opportunities public data file. FedSub is not affiliated with SAM.gov or GSA.