Opportunities
PresolicitationAccepting responses

Y--NGWSP Cutter Lateral Reach 21 Booster Plant

Bureau of Reclamation · UPPER COLORADO REGIONAL OFFICE

Respond by: Oct 30, 2026, 1:00 PM UTC−6Less than a day left

From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC

Notice facts

Source: SAM.gov Contract Opportunities public data file

Solicitation number
140R4026B0003
Notice type
Presolicitation
Posted
Sep 30, 2026
Response date
Respond by Oct 30, 2026, 1:00 PM UTC−6
Set-aside
Small Business Set Aside - Total
NAICS code
237110 Water and Sewer Line and Related Structures Construction
Product or service code
Y1KZ
Place of performance
Not stated
Contracting office
UPPER COLORADO REGIONAL OFFICE (140R40)SALT LAKE CITY, UT 84138
Agency
Department of the Interior · Bureau of Reclamation

Past prime awardees

Source: Award history, not a list of bidders on this notice

Past prime awardees · award history, not a list of bidders on this notice

19 companies held prime contracts from this office under NAICS 237110; 2 of them reported first-tier subawards to companies with NAICS 237110 in FedSub's records.

18 more past prime awardees on Professional

Description

Source: SAM.gov Contract Opportunities public data file

Pre-Solicitation Notice: NGWSP Cutter Lateral Reach 21 Booster Plant PURPOSE: The U.S. Bureau of Reclamation, Upper Colorado Basin Region, Four Corners Construction Office (FCCO), is issuing this pre-solicitation notice for a contemplated construction project titled: Navajo Gallup Water Supply Project (NGWSP) Cutter Lateral Reach 21 Booster Plant. This requirement is being procured in accordance with Part 14 of the Federal Acquisition Regulations (FAR) with a set-aside for small businesses. The Bureau of Reclamation intends to issue a competitive solicitation for this requirement. Based on market research it was determined that there were a sufficient number of qualified small businesses with sufficient bonding capacity to perform as the prime contractor on this project, and as such, it is anticipated to be set-aside for small businesses. PROJECT DESCRIPTION: The Navajo Gallup Water Supply Project (NGWSP) is a major infrastructure project that once constructed, will convey a reliable municipal and industrial water supply from the San Juan River to the eastern section of the Navajo Nation, southwestern portion of the Jicarilla Apache Nation, and the city of Gallup, New Mexico via approximately 280 miles of pipeline, several pumping plants, and two water treatment plants. The principal components of work for the Cutter Lateral Reach 21 Booster Plant include, but are not limited to, the following: 1. Pre-engineered concrete booster pump station, concrete foundation pad, pipe encasement, yard pipe, fencing, electrical equipment, gravel surfacing, and pipe connections. 2. Installation of secondary regulation tank at Regulation Tank No. 3 site, foundation, electrical equipment, yard pipe, and pipe connections. 3. Erosion and scour restoration/prevention: a. Includes a retaining wall, swale, runoff channel, and site regrading. 4. Reinstallation of gravel surfacing at Regulation Tank No. 3 site. 5. Supervisory Control and Data Acquisition (SCADA) equipment and radio…

SAM.gov's data file removes line breaks; read the formatted notice and attachments on SAM.gov.

Versions on SAM.gov

Source: SAM.gov Contract Opportunities public data file

  1. Posted Sep 30, 2026PresolicitationCurrent version

    Respond by Oct 30, 2026, 1:00 PM UTC−6

    This version on SAM.gov (opens SAM.gov in a new tab)

Sources

  • SAM.gov Contract Opportunities public data file: file generated Oct 29, 2026, 3:30 AM UTC
  • USAspending.gov prime contract awards, as loaded into FedSub: actions through Oct 25, 2026
  • USAspending.gov first-tier subaward reports (FFATA): reports through Sep 30, 2026
  • Your partner preferences and your company's records on FedSub

Notices posted or changed after SAM.gov generated its file appear in FedSub after the next load. Check SAM.gov for the current version before you respond.

Source: SAM.gov Contract Opportunities public data file. FedSub is not affiliated with SAM.gov or GSA.

Y--NGWSP Cutter Lateral Reach 21 Booster Plant — Bureau of Reclamation | FedSub