Opportunities
SolicitationAmended Oct 7, 2026Accepting responses

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Department of Energy · FERMILAB - DOE CONTRACTOR

Respond by: Nov 17, 2026, 4:00 PM UTC−619 days left

From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC

Notice facts

Source: SAM.gov Contract Opportunities public data file

Solicitation number
RFP-376508-CD
Notice type
Solicitation
Posted
Sep 17, 2026 · Amended Oct 7, 2026
Response date
Respond by Nov 17, 2026, 4:00 PM UTC−6
Set-aside
No Set aside used
NAICS code
236210 Industrial Building Construction
Product or service code
Z2EZ
Place of performance
Batavia, IL 60510
Contracting office
FERMILAB - DOE CONTRACTOR (899034)Batavia, IL 60510
Agency
Department of Energy · Department of Energy

Past prime awardees

Source: Award history, not a list of bidders on this notice

Past prime awardees · award history, not a list of bidders on this notice

2 companies held prime contracts from this sub-agency under NAICS 236210 (none from this office in FedSub's data); 1 of them reported first-tier subawards to companies with NAICS 236210 in FedSub's records.

1 more past prime awardee on Professional

Description

Source: SAM.gov Contract Opportunities public data file

On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade…

SAM.gov's data file removes line breaks; read the formatted notice and attachments on SAM.gov.

Versions on SAM.gov

Source: SAM.gov Contract Opportunities public data file

  1. Posted Oct 7, 2026SolicitationCurrent version

    Respond by Nov 17, 2026, 4:00 PM UTC−6

    Changed from the version before: Description

    This version on SAM.gov (opens SAM.gov in a new tab)
  2. Posted Oct 6, 2026Solicitation

    Respond by Nov 17, 2026, 4:00 PM UTC−6

    Changed from the version before: Description

    This version on SAM.gov (opens SAM.gov in a new tab)
  3. Posted Sep 17, 2026Solicitation

    Respond by Nov 17, 2026, 4:00 PM UTC−6

    This version on SAM.gov (opens SAM.gov in a new tab)

Sources

  • SAM.gov Contract Opportunities public data file: file generated Oct 29, 2026, 3:30 AM UTC
  • USAspending.gov prime contract awards, as loaded into FedSub: actions through Oct 25, 2026
  • USAspending.gov first-tier subaward reports (FFATA): reports through Sep 30, 2026
  • Your partner preferences and your company's records on FedSub

Notices posted or changed after SAM.gov generated its file appear in FedSub after the next load. Check SAM.gov for the current version before you respond.

Source: SAM.gov Contract Opportunities public data file. FedSub is not affiliated with SAM.gov or GSA.

Central Utility Building Addition and Renovation Construction, UIP… | FedSub