Create a free account to keep browsing
It takes 30 seconds. You can open three notice pages a day without an account; a free account opens every notice, and lists the ones in your NAICS codes.
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Department of Energy · FERMILAB - DOE CONTRACTOR
Respond by: Nov 17, 2026, 4:00 PM UTC−619 days left
From SAM.gov's public data file generated Oct 29, 2026, 3:30 AM UTC; newest notice posted Oct 29, 2026; loaded into FedSub Oct 29, 2026, 5:46 AM UTC
Notice facts
Source: SAM.gov Contract Opportunities public data file
- Solicitation number
- RFP-376508-CD
- Notice type
- Solicitation
- Posted
- Sep 17, 2026 · Amended Oct 7, 2026
- Response date
- Respond by Nov 17, 2026, 4:00 PM UTC−6
- Set-aside
- No Set aside used
- NAICS code
- 236210 Industrial Building Construction
- Product or service code
- Z2EZ
- Place of performance
- Batavia, IL 60510
- Contracting office
- FERMILAB - DOE CONTRACTOR (899034)Batavia, IL 60510
- Agency
- Department of Energy · Department of Energy
Past prime awardees
Source: Award history, not a list of bidders on this notice
Past prime awardees · award history, not a list of bidders on this notice
2 companies held prime contracts from this sub-agency under NAICS 236210 (none from this office in FedSub's data); 1 of them reported first-tier subawards to companies with NAICS 236210 in FedSub's records.
- PARSONS GOVERNMENT SERVICES INC. · Reported first-tier subawards to 5 companies with NAICS 236210 in FedSub's records (latest Jul 2026).
1 more past prime awardee on Professional
Description
Source: SAM.gov Contract Opportunities public data file
On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade…
Versions on SAM.gov
Source: SAM.gov Contract Opportunities public data file
Posted Oct 7, 2026SolicitationCurrent version
Respond by Nov 17, 2026, 4:00 PM UTC−6
Changed from the version before: Description
This version on SAM.gov (opens SAM.gov in a new tab)Posted Oct 6, 2026Solicitation
Respond by Nov 17, 2026, 4:00 PM UTC−6
Changed from the version before: Description
This version on SAM.gov (opens SAM.gov in a new tab)Posted Sep 17, 2026Solicitation
Respond by Nov 17, 2026, 4:00 PM UTC−6
This version on SAM.gov (opens SAM.gov in a new tab)